40% Faster Delivery

Case Study: Envision Giga Factory

SEP Culant successfully delivered a full package of multi-trade services at the Envision Giga Factory via rope access, ensuring safe, efficient delivery with zero incidents.

We deployed multi-skilled rope access teams to manage high-level operations. The primary objective was to deliver complex, multi-trade packages safely and without delay in congested areas. Traditional access methods like scaffolding and MEWPs were entirely impractical due to restricted ground space and the need for rapid mobilisation.

By combining technical capability with world-class rope access expertise, we proved that using cross-disciplined rope access teams is significantly faster and more cost-effective than standard methods.

Project Profile

Location

Sunderland, UK

Facility Type

Giga Factory Construction

Key Challenge

Restricted ground space making scaffolding and MEWPs unusable. Required rapid mobilisation for multi-trade work in congested areas.

Client Stakeholders

Wates, JMAC Group, Ardmac, SES, Asgard

Giga Factory Works 1
Giga Factory Works 2
Giga Factory Works 3
Scope of Work

Multi-Trade Expertise

We provided a complete, single-source solution for multi-trade rope access delivery across six critical disciplines.

Pipefitting

Installation and support of complex, high-level pipework systems.

Lagging & Insulation

Application of thermal insulation to ducting and pipework infrastructure.

Electrical Works

Cable pulling, tray installation, and containment at extreme heights.

Ducting Installation

Rigging, positioning, supporting, and securing ducting in restricted spaces.

Passive Fire Protection

Application of fire wraps, specialist structural coatings, and service penetration sealing.

Rope Access Support

Expert rigging, lifting, and access facilitation for third-party trades.

Background
Unmatched Performance

Project Outcomes.

Through the deployment of up to 8 rope access teams simultaneously (24 personnel total at peak), governed by an IRATA Level 3 Supervisor per team, we executed rigorous safety measures and strict permit-to-work systems.

Our client partners (JMAC, Ardmac, SES, Asgard) valued our ability to mobilise rapidly. The flexibility of one team delivering multiple trades simultaneously prevented disruption to other contractors and heavily outperformed traditional access metrics.

TRIR 0.0

Zero Incidents

Flawless safety record maintained throughout peak operations.

40% Faster

Delivery Speed

Completed project milestones ~40% faster than standard scaffold routes.

30-40%

Cost Reduction

Massive savings against the capital and operational expense of traditional access.

Multi-Trade

High Flexibility

One cross-trained team executing highly complex, concurrent disciplines.

"SEP Culant – Your trusted partner for safe, efficient, and multi-trade rope access solutions. This case study highlights our ability to act as a single-source solution, providing results that traditional access methods simply cannot achieve."

Become A Partner

Safety / Accreditations

IRATA International ISO 45001 ISO 14001 ISO 9001 CIRAS Constructionline RISQS IRATA International ISO 45001 ISO 14001 ISO 9001 CIRAS Constructionline RISQS

SEP Culant Ltd works in accordance with current FASET guidance and promotes best practice in temporary safety systems and fall protection.

For further information on FASET guidance, visit: www.faset.org.uk